首页 > 论文发表知识库 > 圆通相关论文研究

圆通相关论文研究

发布时间:

圆通相关论文研究

yfvynicuyzuyybnxvtyiisyhdizyvbufybyxixutuiuvturcturxhyutuzsrtuittrtuztututvuytduifyguzxkcyyz bgyucxhdvuxyuchuyuhxdthbuyxhcziutyusz

“方”的确是做人之本,是堂堂正正做人的精神脊梁,人的外在是内在的一种反映,内心没有的东西,外表就无法显露;内心有了,外在自然而然就表现出来。人的心灵杰出,行为才可能杰出;人的内心美好,气质才会美好。人的气质、能力在很大程度上是由人的内在品质决定。正如军队,做参谋的,只需要有计谋,但起决定作用的司令官,却要有威望、魄力、具备优秀的品质。对人生而言,技巧只是方法和手段,而决定人生成败的却是品质。 圆,就是处世老练、圆通、善用技巧。圆是成功之道,是通向成功的有力保证。良好的处世技巧能让人在工作、生活中游刃有余。一个人的成功主要依靠什么?在很大程度上是因为他们善于为人处世,会有效说话,推销自己。如幸福的家庭并不一定是妻子貌美如花,丈夫英俊潇洒,幸福的家庭正在于双方彼此尊重体谅,关系融洽和谐。美国著名人际关系专家戴尔﹒卡耐基曾这样说:一个人的成功只有百分之十五是依靠专业技术,而百分之八十五却要依靠人际交往、有效说话等软科学本领。 通过阅读,它让我更深刻地认识人性,认识社会,认识人生,教会我如何为人处世。古训说的好:做人要“外圆内方”,即内要方正,外要圆通;既有鲜明的棱角,又有处世的技巧。只有把握好这其中的平衡点,才算真正把握了自己的人生,从而走向成功。要想获得成功就得具有自信、勇气和热忱。你不觉得正是如此吗?生活中的许多问题和困难,实际上正来源于你自信心的不足,一旦获得了信心,许多问题就迎刃而解。自信能使你保持最佳状态,有助于激发你的潜能。信心会为你带来活力,焕发光彩,使你谈吐洒脱,大度,产生一种不知不觉中感染人的魅力;而丧失信心,会使你显得委琐,不能发挥水平。正像书中所言,刻意改变自己去掌握某种技巧,是永远无法取得成功的,而优秀的品质才是人生成功的决定因素。 一个人内在的修养、品性是最重要的,适当提高一些待人、处世、做事的技巧,不断在工作、交往中学习、调整,而你也会因为这些改变受益匪浅的。我想提醒自己的是,每天对着镜子的时候多一些微笑,那么你看到是就是一个自信的,快乐的,充满活力的,在走向成功的自己。

知道你是为了写论文而烦恼,“没有实践就没有发言权”对你不适用。给你提供一点论文发散切入点,仅供参考!首先,经过多年的孕育发展,快递业已经从物流行业中脱离出来,成为独树一帜的行业,受邮政管理局监管,适用《邮政法》;第二,快递市场的竞争存在着国内市场竞争和国际市场竞争,要看你侧重哪一方面;第三,目前我国国内快递行业处顺丰快递采取直营方式经营,其他民营快递公司均采用品牌加盟模式经营;第四,因为我国快递业起步晚,发展快,目前对快递业的专著不是很多,很多问题的研讨和解决问题的方案都停留在各种大小会议上,没有大量的书籍文献。第五,仅从本人多年的快递从业经验给你一些参考:我国民营快递随经短暂的十余年快速扩张发展,已形成顺丰,申通,圆通;韵达,中通等十数家已具相当规模的快递公司,但在从业人员素质、售后服务(延误、破损、遗失等特殊问题)、快件中转方式、公司自有资本与流动资金充足率、快递公司中高层管理人员结构、素质和管理模式、城市内快件派送交通工具、服务收费定价规则、业务开展范围、与国际快递巨头之间的差距等等都是涉及到快递市场竞争,每一点都可以写一篇论文。所谓的对策不过是各种利益和成本之间权衡的结果,这不单单是各个民营快递公司之间简单的商业竞争,更涉及到国家邮政系统的利益。因为邮政还有一个EMS。

开题很好写的,报告也能搬忙

关于圆柱与圆锥的研究小论文

我们曾学过长方体、正方体的表面积与体积的计算,掌握的都很清楚。今天,我又学了两个立体图形的表面积的计算,那就是圆柱与圆锥。掌握了这两个立体图形体积与表面积是如何求解的。下面,就让我们来分析一下它们的体积与面积。圆柱体积的计算很简单,公式是:底部面积x高。利用这个公式,就能算出圆柱的体积了。如果开始只知道底面的半径或者直径,那么就要先算出部面的面积,再来计算圆柱的体积。接下来,再来看圆柱的表面积。圆柱表面积的求法,就比体积要复杂一些。因为,先要求出圆柱的侧面积,再来求圆柱上底与下底的面积,再把三者相加,方能求出圆柱的表面积。虽然它的表面积求法复杂一些,但是,只要你掌握了方法与公式,今后熟能生巧,一定会做得很快。下面,我们来学圆锥。圆锥就是底面是一个圆,一直向上伸,直到顶部成尖尖的形状。其实,圆锥的体积也很容易求,只比圆柱的体积多出一个三分之一,就是:底面积x高?3。因为,所有圆锥,都是同底面同高度的圆柱的体积的1/3。所以先算出圆柱的体积,再除以3,就是圆锥的体积了。圆锥的表面积书上虽然没有讲,但是我知道。

知道了什么?

你最后应及时说清

例如,我们去超市购物,可以看到各种各样的商品,酒瓶的下端是圆柱形,薯片的盒子是圆柱形,果冻盒子,用圆柱形做得小帽子,等等

关于圆通物流论文答辩

论文答辩的七大问题及解决方法

论文答辩是一种有组织、有准备、有计划、有鉴定的比较正规的审查论文的重要形式。为了搞好毕业论文答辩,在举行答辩会前,校方、答辩委员会、答辩者(撰写毕业论文的作者)三方都要作好充分的准备。以下是我整理的论文答辩的七大问题及解决方法,欢迎阅读。

问题:毕业设计整体比较差。PPT上出现很多错别字,论文没有按照模板排版。问学生中用到了什么数据库,他居然回答说HTML。

建议:态度一定要诚恳,知之为知之不知为不知。回答问题一定要面对着评委,一定要自信,一定要听请问题再回答。

某高校软件学院在这个周末举行了本科生毕业论文答辩,作为答辩评审老师之一全程参与了这个过程。心情的走势越发的觉得和最近股票市场的走势一样,跌宕起伏,变化莫测,让人捉摸不透。

第一天早上“开盘”高开,心里正高兴着,就和其他老师交流,问今年的毕业生毕业论文的水平提高了不少。没有想到盘中出现重大利空,一路狂跌,简直惨不忍睹。下午开盘后,出现短暂的回调,但改变不了下跌的趋势。

第二天相对于第一天也算是高开,而且总体趋势不错,虽然盘中也出现震荡,但总体情况相比昨天会好很多。

据我从其他组了解的情况来看,总体水平还是去年那个熊样,不过是我比较幸运罢了,第二天我那组的学生算是学院里比较优秀的,学习的态度比较端正,对毕业论文还算重视,我想这是第二天能够高开高走的重要原因。

两天的答辩中总共有41名学生参加,比较突出的就3名学生,而这三名学生平时学习算是比较认真的,两个都保研,另外一个和国内的知名企业签了工作。其中有17名左右的同学,毕业论文马马虎虎算过得去,至少他们还是比较认真的,虽然做得不是很好,所做得工作不是很多,但至少能够将自己所做的工作讲清楚。剩下的学生的表现,只能用惨不忍睹来形容。不仅态度不认真,自己做的工作少,甚至直接从其他地方copy过来,连一些基本的概念都搞不懂。

现举几个实例来说明:一个去年答辩没有通过的学生,今年再来参加答辩,不仅论文的字数、格式不符合要求,而且PPT上所讲的内容和论文的居然不一致。问他这一年做什么了,论文怎么还是这么差,他回答说着一年都忙于找工作了,没有时间弄论文。问他工作找到没有,他居然说还没有找到?还有很多做系统的学生,问一些最简单的问题,都回来不上来;这充分说明他的论文根本不是他自己做的;比如做网站的,问他用到了什么技术来实现,他居然都答不上来。还有更搞笑的,问他文中用到了什么数据库,他居然回答说HTML。

造成毕业设计整体比较差的原因,我个人不想追究。但学生自己和部分学生导师确实都存在的问题。学生不重视,这是主要的一个原因,先不说论文的工作是不是你做的,你的论文格式和PPT这些基本没技术含量的东西,你总得认真对待吧。PPT上的所讲的内同和你论文的不一样,PPT上出现很多错别字、论文没有按照模板排版等等这些低级问题,只要你认真对待总能避免。部分导师也有原因,对学生不负责任,学生的毕业论文还有答辩的PPT,导师看都没有看(学生把导师姓名写错的情况,更绝的把自己的学号都写错了),以致造成很多苦笑不得的状况。

很多人都觉得学生不重视论文,都是忙于找工作,以致没有时间做毕业设计和写论文。但在这两天中,我发现一个现象,那些找到工作的和考研的学生的论文情况比那些没有找到工作的学生好的多。如果你因为找工作,而且找到工作了,论文情况稍微差点,还是可以理解的,但是你既不去找工作,又不重视论文,总是抱着侥幸的心里,希望评委们放你一马的心里,这种情形个人觉得是不可原谅。虽然学校最终不能通过答辩的人几乎没有,但至少得让你二答吧。

当然作为学生,尽管你论文状况不好,但你要是有以下的情形,恭喜你,你获得了免死金牌。

第一,考上研究生;

第二,找到工作的;

第三,领导的学生;

第四,教授的学生。

所以当你既不是以上四类人,毕业论文又做得奇差,不让你二答还让谁二答呢?

现在谈谈他们毕业答辩存在的问题以及建议:

一、PPT存在的问题。字体的大小不统一,背景太过鲜艳,连内容都看不清,段落的首行缩进都不统一,内容都不认真检查,出现了一些低级错误,比如存在错别字,或者将概念混淆。

二、将自己不懂的概念写在PPT。一问就被问倒了。

三、态度不够真诚,不懂装懂。问一个基本的问题,就露出破绽。

四、论文的内容以及实验结果都是从网上复制过来的,还带着网络的印记。

五、选的题目与自己的专业无关,而且也做不好,说不清楚。

六、报告的内容,不是自己所做的,都是一些基本的概念,自己做的内容很少提及。

七、提交的论文都没有认真看,存在很多错别字,还有很多抄袭的印记。

建议:

一、答辩之前应该将PPT拷入机器,并且看是否能够正常播放。

我的小组存在个别学生在答辩的过程中PPT打不开,还有更极品的就是,答辩开始一分钟后,发现所用的PPT不是自己要使用的那份。

二、态度一定要诚恳,知之为知之不知为不知。

评委老师都知道自己学院学生的水平,只要诚实老师一般都不会太为难你。

三、一定要自信。

有些男生上去报告,那声音小的可怜。后来一个评委导师打趣说,你的声音和你的论文中的图片一样,是故意让我看不清。

四、对老师要有礼貌。

有些学生在上面报告连最基本的礼仪都不懂,给人印象非常不好。

五、答辩之前一定要认真检查PPT以及论文。

六、回答问题一定要面对着评委。

不然给人的感觉是你不尊重评委。

七、一定要听清问题再回答。

有些学生胡扯了半天,都没有回答到点子上,到底是自己不懂呢,还是没有听清问题就开始胡扯。

扩展: 物流管理专业答辩的问题及回答

1.为什么选择这个课题(或题目),研究、写作它有什么学术价值或现实意义。 (必知)研究这个课题的意义和目的是什么?

因为是抽签决定题目的。

选题目的和意义:

目的:我国物流产业兴起于上世纪 90年代,起步虽晚,但发展势头强劲,中国物流与采购联合会、中国物流信息中心最新统计数据显示,2022年一季度中国社会物流总额为万亿元人民币(下同),按可比价格计算,同比增长,比上年同期增加近19%。初步预计2010全年社会物流总额有望突破百万亿元大关。现代物流越来越受到重视,成为“第三利润泉”,而现代物流的增值服务作为物流的发展趋势和核心竞争力,也应该得到广泛的重视与发展。随着物流市场的发展趋向成熟,超越单一的物流服务,转向为客户提供增值服务,以提升企业的知名度和核心竞争力已经成为物流增值服务企业实现自身价值的新思路。

意义:本论文题目的研究是为了根据现代物流增值服务的现状,探讨发展现代物流增值服务的必要性、途径和方向等。

学术价值:物流的增值服务是物流行业成熟的标志,是未来物流服务发展的方向,结合自身的专业知识,研究和探索现代物流增值服务,有利于知识和现实情况的结合,通过理性的思维,利用科学的数据和逻辑,从物流行业长期发展的角度论述其发展途径和方向。

2.说明这个课题的历史和现状,即前人做过哪些研究,取得哪些成果,有哪些问题没有解决,自己有什么新的看法,提出并解决了哪些问题。(必知)

相关课题,有通过对省市的物流公司所提供服务的类别和如何开展增值服务,通过物流基本服务于增值服务的比较,甚至基于回归模型物流企业开展增值服务的对策分析,结论都是物流的增值服务还仅仅在起步阶段,物流业对其必要性的认识不足,如果物流企业要开展增值服务,要投入巨大人力、物力、财力时,才能得到增值服务收益。

在中国特色主义社会之下,怎样利用政府政策的支持,如何投入最小的人力物力财力得到最小的增值服务收益,怎么因地制宜地企划不同物流公司的增值服务的发展途径 等等。

我认为国家对物流行业的支持和投放主要集中在国企,民营的物流企业难以在国家政策上得到优惠。我国物流行业的进入门槛相对而言较低,企业“小、散、乱”的局面未得到根本改变,还陷在价格战的恶性循环中不能自拔。在现代物价上升,物流成本随之不断提高的现状之下,我国大多数物流企业还处于直接压缩物流基础作业成本的阶段,未能进行物流服务的创新并从物流增值服务中寻求利润。

我认为虽然物流的增值服务是未来物流行业的发展趋势,但是不同的物流企业有不同的情况 应该量力而为,不求大而全 ,选择小而专,定位自己最擅长的领域,如运输、仓储、配送等作为重点发展的核心业务,这样既能在弱肉强食的竞争中生存,也可以形成自身的品牌特色。

3.文章的'基本观点和立论的基本依据。(必知)

基本观点:现代物流的增值服务是物流服务发展的风向标,物流企业应当就自身的现状选择定位适合的发展增值服务的途径,以迎合市场的需求。

基本依据:首先是增值服务的市场需求:(从中国仓储协会组织第三次全国范围内的物流状况调查得知,在物流需求市场期望的物流服务内容中,其中工业企业需要市内配送服务有29%,需要物流信息查询、条码采集、物流系统设计及代为报关各为7%,在商业企业中,需要物流系统设计为20%,需要代结贷款、物流信息查询、市内配送服务各占7%,需要条码采集为13%。这一组数据足以说明我国的物流市场对物流的增值服务有着巨大需求,物流增值服务是可供企业挖掘的一个巨大利润源泉。)

所以,发展现代物流的增值服务这一课题是很有必要性及现实意义的。

4.本文提出的见解的可行性。

我觉得论文提出的观点只是理论,实际工作经验不足仍使得这篇文章存在与实际联系不够紧密的问题。而且因为有论文幅度的限制所以见解更不够全面,企业应该根据自身的优势和市场的需求,因地制宜地发展有自己特色的物流增值服务。

5.定稿交出后,自己重读审查新发现的缺陷。

框架的逻辑性不够强,在文章的开头没有引用学者的有关相关话题的评论,行文不够通畅,某些方面讨论不够深入,论据不充分。

6.写作毕业论文的体会

写论文不是一个人的事,需要尊重老师的意见,和老师不断探讨交流论文的结构框架和内容等,需要站在前人的肩膀上,不断完善发展,加深自身对相关课题的了解和研究,认识到自己在大学四年学到的知识需要和实际相结合,才能运用到现实生活中去,认识到自己实践能力的

7.本文的优缺点。

优点:结构基本符合逻辑,主题突出,抓住重点,行文通畅,以归纳总结法论证现代物流增值服务的问题、解决策略及其发展方向。

缺点:框架的逻辑性不够强,在文章的开头没有引用学者的有关相关话题的评论,某些方面讨论不够深入,论据不充分,由于论文篇幅的限制,难以对相关课题进行深入的探讨。

高校快递服务满意度开题答辩记录表怎么写。答辩记录表的写法:(1)论文标题。向答辩小组报告论文的题目,标志着答辩的正式开始。(2)简要介绍课题背景、选择此课题的原因及课题现阶段的发展情况。(3)详细描述有关课题的具体内容,包括答辩人所持的观点看法、研究过程、实验数据、结果。(4)重点讲述答辩人在此课题中的研究模块、承担的具体工作、解决方案、研究结果。(5)侧重创新的部分。这部分要作为重中之重,这是答辩教师比较感兴趣的地方。(6)结论、价值和展望。对研究结果进行分析,得出结论;新成果的理论价值、实用价值和经济价值;展望本课题的发展前景。(7)自我评价。答辩人对自己的研究工作进行评价,要求客观,实事求是,态度谦虚。经过参加毕业设计与论文的撰写,专业水平上有哪些提高、取得了哪些进步,研究的局限性、不足处、心得体会。

高校快递服务满意度开题答辩记录表怎么写高校快递服务满意度记录表一、服务质量服务质量,包括高校快递的快递服务的时效性、准确性和安全性等。二、服务体验服务体验,包括高校快递的服务态度、服务质量、服务效率、服务范围等。三、服务安全服务安全,包括高校快递的物品安全性、安全防范措施、安全责任落实等。四、服务价格服务价格,包括高校快递的服务价格、折扣政策、支付方式等。五、服务可用性服务可用性,包括高校快递的服务覆盖范围、服务可用性、服务时间可用性等。六、服务满意度服务满意度,包括高校快递的服务质量满意度、服务体验满意度、服务安全满意度等。通过对上述每项服务的记录,可以准确了解每一项服务的满意度,从而更好地提升高校快递服务的整体满意度。

答辩记录:

答辩中答辩学生首先自述了论文的研究背景及其研究意义,接着简要介绍整篇论文的结构,在答辩过程中教师提出的主要问题及回答的简要情况如下:

1.为什么选择这个课题(或题目),研究、写作它有什么学术价值或现实意义?

答:在我国物流业发展不成熟的情况下,大型电商企业自建物流存在很普遍,自建物流作为大型电商企业战略存在具有很大的发展空间,但目我国前对于大型电商企业自营物流的认识不够。

研究大型电子商务企业自建物流模式关键因素,建立最佳的自建物流配送模式,成功打造一条完善的物流供应链,正确引导大型电商企业自建物流健康发展,这就是本文研究的现实意义。

2.文章主要从哪些方面来分析研究大型电子商务自建物流关键因素?

答:本文的核心内容是大型电子商务企业自建物流关键因素研究,主要是从两个方向来研究:第一个方向是从大型电子商务企业自建物流的发展现状出发研究;第二个方向是基于因子分析法来研究。

这两个方向都是寻找大型电子商务企业主要影响因素的共性和相关性,将一些因素之间相关性比较强,共性比较大的因素归为一类,对这一类用一个能够表示其显著共性的新的因素进行解释替代,作为关键因素。

发展现状的理论分析只是基于理论的共性提取,更重要的是注重理论和客观事实。基于因子分析法的研究,是在前面对于大型电子商务企业自建物流的发展现状出发研究基础上的进一步研究,更具有数据的支持性和科学性。

3.本文为什么采用因子分析法来研究大型电子商务企业自建物流关键因素?

答:因子分析法是一种将多变量化简的多元统计、寻找这种内在结构(或联系)的方法。将原始变量进行分解,然后归纳出潜在的“类别”,变量间相关性较强的归为一类,且不同类别间的变量则相关性较低。

每类变量代表一个“共同因子”,即一种内在结构(或联系)。本文运用因子分析法的目的就是用少数几个因子去描述许多影响大型电子商务企业自建物流因素之间的联系,即将相关比较密切的几个影响因素归在同一类中,每一类因素就成为一个因子,以较少的几个因子反映所有影响因素的大部分信息。

而这个能够反应大部分因素的因子就是研究出的关键因素。

4.整篇文章中有哪些是你自己的观点?

答:从整篇文章来看,第二章我是依据电商物流模式和自建物流模式所拥有的特性和概念理论,归纳并陈述了自建物流模式的主要特点。

第三章我是根据各种资料以及网上的数据分析了国内大型电子商务企业自建物流的发展现状,并通过以典型的大型电子商务企业自建物流发展现状为例,对国内大型电子商务企业自建物流进行了综合评价。

第四章除了一些理论以外,我结合自身的认识,在基于大型电子商务企业自建物流发展现状下的影响因素的研究后,从企业自身角度和客户角度出发,本着实事求是的原则,在查询大量的相关文献资料和国内外学者的学术研究的基础下。

运用因子分析法研究出了大型电子商务企业自建物流的关键因素,并对影响大型电子商务企业的关键因素进行的详细的分析。

圆通物流现状及对策研究论文

1.《我国快递业发展的现状,问题与对策》2.《湖南省民营快递业发展对策探讨》3.《我国民营快递业发展中存在的问题及解决对策》都是重庆维普上的论文,如果下不了全文请留言或者来此处找我

4、 仓储物流人员主要职责仓储物流人员主要职责类别:仓储管理 大小:80 KB 日期:2008-02-165、 2007年仓储物流部年度工作总结2007年仓储物流部年度工作总结类别:工作总结 大小:5 KB 日期:2008-02-1611、 中国物流配送研究报告第一部分 相关概念与行业特征分析第一章 物流配送相关概念及行业特征第二部分 物流业发展现状分析第二章 世界物流业发展状况 第三章 我国物流业发展的宏观状况第四章 物流市场需求分析第五章 物流...类别:物流管理 大小:397 KB 日期:2007-12-2512、 第三方物流发展趋势第三方物流发展趋势不断变革中的顾客价值和前景行业发展的趋势和启示服务提供商的情况和战略物流的发展趋势类别:物流管理 大小:486 KB 日期:2007-12-2014、 仓储物流无线局域网方案建议书目 录1 前 言 NETGEAR公司简介 NETGEAR公司在国内主要企业级无线局域网案例 52 仓储物流无线局域网网络结构 仓储物流信息化的特点...类别:企业MIS 大小: MB 日期:2007-11-252、 物流发展中存在的问题及其对策研究[摘要] 我国从改革开放后引入物流的概念,经过20多年的经济建设和发展,我国物流发展迅速,取得了很大的成就。但由于我国物流发展比较迟,物流的总体运作效率不高,物流基础设施建设不完善,物流技术及信息化、...类别:毕业论文 大小:50 KB 日期:2007-09-3023、 化妆品销售物流项目可行性报告项目名称及主办单位 名称: 化妆品销售物流项目 主办单位:XX化妆品有限公司拟建合资企业计划 企业名称:待定 企业总部地点:待定 总投资额:RMB...类别:可研报告 大小:24 KB 日期:2007-09-1524、 电子商务对物流及其管理的影响摘 要新世纪,因特网的应用所爆发出的能量以几何级的速度影响到了人类社会的各个方面,全球的经济将以全新的模式飞速发展,以电子商务为核心的经营理念使整个社会的经济结构、经营模式发生了前所未有的变化。电子商...类别:毕业论文 大小:98 KB 日期:2007-08-2326、 发展我国物流产业的政府行为分析摘要:物流已成为企业的竞争优势点和新的增长点。在我国加入WTO后,国内物流业面临着国外先进物流企业的巨大竞争压力,我国物流业要想能应对国外的竞争压力以及健康有序地发展,离不开政府的参与支持。本文将从我...类别:毕业论文 大小:131 KB 日期:2007-08-1527、 物流中心仓库管理软件设计书目 录范围 4A系统目标 4B主要软件需求 4C设计约束、限制 4数据设计 6A:数据结构 6单据描述 6数据结构 6B:数据存放约束 8体系结构设计 9A:数据和控制流 9基础数据设置 9仓库、库...类别:详细设计 大小:695 KB 日期:2007-08-1428、 某物流公司战略优化方案目 录基本框架及说明第一篇 环境分析一、 行业背景分析二、 SWOT及组合分析第二篇 提高企业盈利能力一、成本管理1.1运输管理1.2仓储管理1.3配送管理1.4财务控制二、增值服务2.1信息系统2...类别:物流管理 大小:698 KB 日期:2007-07-2929、 现代物流手段和物流技术第一章 物流概述 第一节 物流的含义与性质 第二节 商流与物流的关系 第三节 物流的职能与作用 第二章 物流系统化 第一节 物流系统化的概念和意义 第二节 物流系统化管理 第三节 物流...类别:物流管理 大小:165 KB 日期:2007-07-2633、 物流管理系统用户登陆与数据录入管理【摘要】本论文以基于WEB的物流管理系统下的5个子模块的开发为背景进行书写的。这五个子模块为:1、用户登录;2、估算用装卸作业录入;3、请求运输费用录入;4、请求运输费用-上传;5、特别城市设定录入。...类别:毕业论文 大小:203 KB 日期:2007-07-1442、 物流类企业互联方案物流类企业互联方案类别:网站建设 大小:63 KB 日期:2007-03-2444、 物流设施设备分类体系初探前言电子商务时代的来临,使物流具备了一系列新特点:一、 信息化 电子商务时代,物流信息化是电子商务的必然要求。物流信息化表现为物流信息的商品化、物流信息收集的数据库化和代码化、物流信息处理的电子化和计...类别:毕业设计 大小:44 KB 日期:2007-02-2645、 物流信息系统业务流程用户自定义平台第一章 绪论 课题背景 课题研究内容 论文的组织结构 5第二章 动态企业建模思想 企业建模的原因 动态企业建模概念 动态企业建模体系结构框架 92....类别:毕业设计 大小:242 KB 日期:2007-01-2351、 电子商务与物流论述了电子商务的基本概念、形式和优点,深入分析了电子商务与物流的密切关系,并提出了加快电子商务物流建设的几点思考摘要1介绍了电子商务与物流系统的关系,指出物流系统是实现电子商务的保障,提出了我国发展电...类别:电子商务 大小:427 KB 日期:2006-11-1552、 物流管理系统一、业务管理............................................................ 71.订单受理.............................类别:课题课程 大小:197 KB 日期:2006-10-1456、 物流仓储项目策划书一、公司简介---3二、公司服务内容31、仓储服务 --- 32、配送服务 ---43、信息服务 ---44、物流加工服务 ---45、代收款服务 -46、综合解决方案服务 ---47、国际物流服务 ...类别:项目管理 大小:78 KB 日期:2006-08-3057、 物流管理信息系统的软件实现…………………………………………………………………….4 ABSTRACT………………………………………………………………….5 第一章 绪 论…………………………………………………………...6 第...类别:毕业设计 大小:457 KB 日期:2006-08-2558、 高校后勤物流管理系统目录引 言 1第1章 绪论 系统设计目标 开发设计思想 系统设计原则 3第2章 系统分析 可行性分析 经济可行性 技术可行性 ...类别:学术论文 大小:385 KB 日期:2006-08-2359、 某企业erp系统物流系统需求分析报告目录1 引言 编写目的 项目背景 定义 参考资料 72 任务概述 总体目标 使用者特点 项目特殊说明 假设与约束 93 ...类别:需求分析 大小:312 KB 日期:2006-08-1260、 物流中心生产力评估指标100诀物流中心生产力评估指标100诀目录前言壹.生产力评估的意义与目的1生产力的意义2评估的意义3生产力评估的目的贰.生产力评估的运用原理1生产力评估的基本原理 2生产力评估的指标考量3选择生产力指标的原则...类别:企业诊断 大小:37 KB 日期:2006-08-1161、 无线仓库条码物流跟踪管理项目建议书无线仓库条码物流跟踪管理项目建议书1. 系统简介 42. 目前环境 43. 解决方案 . 系统目标 . 系统主结构 . 系统主流程图 . 系统工作流程图 . 数...类别:企业MIS 大小:329 KB 日期:2006-08-1162、 综合物流管理系统前 言 2第一章 综合物流管理系统的开发环境 设计软件 Delphi简介 面向对象编程的概念 Delphi的可视化编程环境 数据库系统 9...类别:毕业设计 大小:683 KB 日期:2006-08-0963、 物流管理系统可行性分析报告1.引言 编写目的背景参考资料 存在的问题.业务概况2.现行组织系统概况组织目标和战略3. 拟建立的信息系统 简要说明 对组织的意义与影响4. 经济可行...类别:可研报告 大小:9 KB 日期:2006-08-0964、 连锁超市物流管理系统1 需求分析 系统背景分析 超市商品流通业务流程图 数据流程图 数据字典 数据项描述 数据结构 数据流的描述 ...类别:概要设计 大小:668 KB 日期:2006-08-0865、 物流有限公司质量记录手册1目的对记录进行有效的控制和管理,以保证提供的服务符合规定的要求和质量管理体系有效运行的客观证据,为验证和制定纠正措施和预防措施提供依据。2适用范围本程序对记录的填写、传递、保管、归档、借阅、保存期...类别:质量管理 大小:16 KB 日期:2006-08-0866、 物流管理系统出库管理模块的设计与实现摘 要物流信息技术是现代信息技术在物流各个作业环节中的应用,是物流现代化极为重要的领域之一。物流管理系统是企业信息系统的基础,是企业信息化的基础,是物流系统中进行物流信息处理的管理子系统。物流管理系统...类别:毕业设计 大小:335 KB 日期:2006-08-0667、 开题报告——以KPI为核心的物流企业绩效管理体系设计开题报告——以KPI为核心的物流企业绩效管理体系设计类别:毕业设计 大小:32 KB 日期:2006-08-0468、 资物流商业计划书商业计划书第一部分 公司简介………………………………………………4第二部分 WYT全息智能化农资物流服务体系的基本含义……7第三部分 市场背景分析与发展机遇……………………………8第四部分 基本优势与...类别:商业计划 大小:35 KB 日期:2006-08-0369、 物流配送系统——需求分析在二十一世纪的今天,随着科学技术的发展,特别是在科技特别发达的当代,每个行业都与其他行业有着密不可分的关系。随着各大联锁超市的开设,缺什么只要电话通知,都可以送货上门。我们设计的系统正是针对个大型连锁...类别:需求分析 大小:14 KB 日期:2006-08-0370、 电子商务模式下的港口物流信息平台信息共享平台是连接与国际贸易有关的政府部门(如交通、海关、外经贸、检验检疫等)、社会服务机构(如银行、保险、运输、仓储、港口、机场等)和各类贸易、生产、运输企业的内部管理信息系统并集成它们的数据,开展...类别:电子商务 大小:347 KB 日期:2006-08-0371、 鞍山钢铁集团公司物流及仓储项目解决方案一、公司简介--3二、公司服务内容--31、仓储服务 - 32、配送服务 -43、信息服务 -44、物流加工服务 -45、代收款服务 ---46、综合解决方案服务 -47、国际物流服务 -5三、公司服...类别:物流管理 大小:77 KB 日期:2006-07-3072、 现代物流发展的国际趋势美国经济高度发达,也是世界上最早发展物流业的国家之一。美国政府推行自由经济政策,其物流业务数量巨大,且异常频繁,因而就决定了美国多渠道、多形式的物流结构特征。�(一)美国物流业发展概况和结构特点 美国...类别:物流管理 大小:63 KB 日期:2006-07-2873、 助理物流师试题助理物流师考证总复习类别:职称考试 大小:19 KB 日期:2006-07-2874、 物流管理部仓库标准操作程序(SOP)1 仓库建筑与设施的管理、维修和更新2 货物入库操作3 装卸作业4 货物在库保养及管理5 每日自我检查6 清洁卫生工作7 仓库温湿度的控制8 害虫防治9 仓库盘点标准操作程序 10 中转仓批次号管理1...类别:仓储管理 大小:59 KB 日期:2006-07-2675、 海尔整体物流方案海尔整体物流系统企业整体物流系统是应用整体系统的方法对实体供给和实体分配,包括市场预测、物料需求、采购、原料供应、货物运输、存货控制、仓储、搬运、包装、顾客服务及物流信息在内的活动予以综合管理,以适当...类别:物流管理 大小:18 KB 日期:2006-07-2376、 物流中心的订单处理1、整体流通环境的演变趋势,探讨物流中心所面临的课题,以及那些是订单处理所需克服的。 2、订单处理的范围、订单处理与整体物流作业和信息系统的相关性以及订单处理的作业流程。 3、探讨每个订单处理流程,...类别:物流管理 大小:423 KB 日期:2006-07-2277、 开通江苏省货运班车的可行性方案(物流)某快递公司,根据实际的发展状况,由于货量的迅速上升,对开通货运班车进行了研究。此方案对开通货运班车,进行了研究,在实际中具有实用意义!类别:可研报告 大小:28 KB 日期:2006-07-2178、 物流信息管理系统介绍介绍物流信息管理系统组成及作业流程目 录1.前 言 32.系统流程图 53.仓库信息管理系统 54.仓库控制与监控系统 55.采购管理系统 请购单 请购审核 采购单 55...类别:企业MIS 大小:80 KB 日期:2006-07-2179、 物流配送第一章 物流配送相关概念及行业特征………… 1第一节 物流配送的相关概念 ……………………………… 1什么是物流?什么是配送?物流配送提供一些什么样的服务?在当今市场条件下它如何影响着企业的竞...类别:物流管理 大小:414 KB 日期:2006-07-2080、 物流配送系统1.1 编写背景和目的 当今世界经济发展呈现出全球化和市场化的两大趋势。经济发展、科技进步和信息革命,将世界带入前所未有的全球化的时代。集物流、信息流和资金流于一身的物流配送中心,在这全球化和市场化的...类别:其他 大小:589 KB 日期:2006-07-2081、 物流业务平台需求分析报告目录1 引言 编写目的 项目背景 定义 参考资料 72 任务概述 总体目标 使用者特点 项目特殊说明 假设与约束 93 ...类别:需求分析 大小:315 KB 日期:2006-07-2082、 浅析客户关系管理在第三方物流企业中的应用摘要:客户关系管理(CRM)是一种新型的企业战略和管理手段,本文主要针对第三方物流企业客户关系的特点,分析了第三方物流企业实施客户关系管理的必要性,重点对第三方物流企业如何进行客户关系管理进行了研究探...类别:学术论文 大小:15 KB 日期:2006-07-1786、 中国物流运输业的现在与未来中国物流运输业的现在与未来 中国的物流运输市场仍处于草创阶段,效率不彰;补强其不足之处,可能正是获利商机之所在

暖通空调相关研究论文英文

这位学长,我只知道国内最好的核心期刊是《暖通空调》,国外的就不清楚了,呵呵。要是太阳能相关的,可以发到《太阳能学报》。

testing of an air-cycle refrigeration system for road transportAbstractThe environmental attractions of air-cycle refrigeration are considerable. Following a thermodynamic design analysis, an air-cycle demonstrator plant was constructed within the restricted physical envelope of an existing Thermo King SL200 trailer refrigeration unit. This unique plant operated satisfactorily, delivering sustainable cooling for refrigerated trailers using a completely natural and safe working fluid. The full load capacity of the air-cycle unit at −20 °C was 7,8 kW, 8% greater than the equivalent vapour-cycle unit, but the fuel consumption of the air-cycle plant was excessively high. However, at part load operation the disparity in fuel consumption dropped from approximately 200% to around 80%. The components used in the air-cycle demonstrator were not optimised and considerable potential exists for efficiency improvements, possibly to the point where the air-cycle system could rival the efficiency of the standard vapour-cycle system at part-load operation, which represents the biggest proportion of operating time for most : Air conditioner; Refrigerated transport; Thermodynamic cycle; Air; Centrifuge compressor; Turbine expander COP, NomenclaturePRCompressor or turbine pressure ratioTAHeat exchanger side A temperature (K)TBHeat exchanger side B temperature (K)TinletInlet temperature (K)ToutletOutlet temperature (K)ηcompCompressor isentropic efficiencyηturbTurbine isentropic efficiencyηheat exchangerHeat exchanger effectiveness1. IntroductionThe current legislative pressure on conventional refrigerants is well known. The reason why vapour-cycle refrigeration is preferred over air-cycle refrigeration is simply that in the great majority of cases vapour-cycle is the most energy efficient option. Consequently, as soon as alternative systems, such as non-HFC refrigerants or air-cycle systems are considered, the issue of increased energy consumption arises over legislation affecting HFC refrigerants and the desire to improve long-term system reliability led to the examination of the feasibility of an air-cycle system for refrigerated transport. With the support of Enterprise Ireland and Thermo King (Ireland), the authors undertook the design and construction of an air-cycle refrigeration demonstrator plant at LYIT and QUB. This was not the first time in recent years that air-cycle systems had been employed in transport. NormalAir Garrett developed and commercialised an air-cycle air conditioning pack that was fitted to high speed trains in Germany in the 90s. As part of an European funded programme, a range of applications for air-cycle refrigeration were investigated and several demonstrator plants were constructed. However, the authors are unaware of any other case where a self-contained air-cycle unit has been developed for the challenging application of trailer King decided that the demonstrator should be a trailer refrigeration unit, since those were the units with the largest refrigeration capacity but presented the greatest challenges with regard to physical packaging. Consequently, the main objective was to demonstrate that an air-cycle system could fit within the existing physical envelop and develop an equivalent level of cooling power to the existing vapour-cycle unit, but using only air as the working fluid. The salient performance specifications for the existing Thermo King SL200 vapour-cycle trailer refrigeration unit are listed .It was not the objective of the exercise to complete the design and development of a new refrigeration product that would be ready for manufacture. To limit the level of resources necessary, existing hardware was to be used where possible with the recognition that the efficiencies achieved would not be optimal. In practical terms, this meant using the chassis and panels for an existing SL200 unit along with the standard diesel engine and circulation fans. The turbomachinery used for compression and expansion was adapted from commercial . Thermodynamic modelling and design of the demonstrator plantThe thermodynamics of the air-cycle (or the reverse ‘Joule cycle’) are adequately presented in most thermodynamic textbooks and will not be repeated here. For anything other than the smallest flow rates, the most efficient machines available for the necessary compression and expansion processes are turbomachines. Considerations for the selection of turbomachinery for air-cycle refrigeration systems have been presented and discussed by Spence et al. [3]. a typical configuration of an air-cycle system, which is sometimes called the ‘boot-strap’ configuration. For mechanical convenience the compression process is divided into two stages, meaning that the turbine is not constrained to operate at the same speed as the primary compressor. Instead, the work recovered by the turbine during expansion is utilised in the secondary compressor. The two-stage compression also permits intercooling, which enhances the overall efficiency of the compression process. An ‘open system’ where the cold air is ejected directly into the cold space, removing the need for a heat exchanger in the cold space. In the interests of efficiency, the return air from the cold space is used to pre-cool the compressed air entering the turbine by means of a heat exchanger known as the ‘regenerator’ or the ‘recuperato ’. To support the design of the air-cycle demonstrator plant, and the selection of suitable components, a simple thermodynamic model of the air-cycle configuration shown in was developed. The compression and expansion processes were modelled using appropriate values of isentropic efficiency, as defined in heat exchange processes were modelled using values of heat exchanger effectiveness as defined in The model also made allowance for heat exchanger pressure drop. The system COP was determined from the ratio of the cooling power delivered to the power input to the primary compressor, as defined in illustrate air-cycle performance characteristics as determined from the thermodynamic model:illustrates the variation in air-cycle COP and expander outlet temperature over a range of cycle pressure ratios for a plant operating between −20 °C and +30 °C. The cycle pressure ratio is defined as the ratio of the maximum cycle pressure at secondary compressor outlet to the pressure at turbine outlet. For the ideal air-cycle, with no losses, the cycle COP increases with decreasing cycle pressure ratio and tends to infinity as the pressure ratio approaches unity. However, the introduction of real component efficiencies means that there is a definite peak value of COP that occurs at a certain pressure ratio for a particular cycle. However,illustrates, there is a broad range of pressure ratio and duty over which the system can be operated with only moderate variation of class of turbomachinery suitable for the demonstrator plant required speeds of around 50 000 rev/min. To simplify the mechanical arrangement and avoid the need for a high-speed electric motor, the two-stage compression system shown was adopted. The existing Thermo King SL200 chassis incorporated a substantial system of belts and pulleys to power circulation fans, which severely restricted the useful space available for mounting heat exchangers. A simple thermodynamic model was used to assess the influence of heat exchanger performance on the efficiency of the plant so that the best compromise could be developed show the impact of intercooler and aftercooler effectiveness and pressure loss on the COP of the proposed two-stage system in incorporated an intercooler between the two compression stages. By dispensing with the intercooler and its associated duct work a larger aftercooler could be accommodated with improved effectiveness and reduced pressure loss. Analysis suggested that the improved performance from a larger aftercooler could compensate for the loss of the the impact of the recuperator effectiveness on the COP of the plant, which is clearly more significant than that of the other heat exchangers. As well as boosting cycle efficiency, increased recuperator effectiveness also moves the peak COP to a lower overall system pressure ratio. The impact of pressure loss in the recuperator is the same as for the intercooler and aftercooler shown in. The model did not distinguish between pressure losses in different locations; it was only the sum of the pressure losses that was significant. Any pressure loss in connecting duct work and headers was also lumped together with the heat exchanger pressure loss and analysed as a block pressure specific cooling capacity of the air-cycle increases with system pressure ratio. Consequently, if a higher system pressure ratio was used the required cooling duty could be achieved with a smaller flow rate of air. shows the mass flow rate of air required to deliver 7,5 kW of cooling power for varying system pressure the demonstrator system was to be based on commercially available turbomachinery, it became important to choose a pressure ratio and flow rate that could be accommodated efficiently by some existing compressor and turbine rotors. and were based on efficiencies of 81 and 85% for compression and expansion, respectively. While such efficiencies are attainable with optimised designs, they would not be realised using compromised turbocharger components. For the design of the demonstrator plant efficiencies of 78 and 80% were assumed to be realistically attainable for compression and turbomachinery efficiencies corresponded to higher cycle pressure ratios and flow rates in order to achieve the target cooling duty. The cycle design point was also compromised to help heat exchanger performance. The pressure losses in duct work and heat exchangers increased in proportion with the square of flow velocity. Selecting a higher cycle pressure ratio corresponded to a lower mass flow rate and also increased density at inlet to the aftercooler heat exchanger. The combined effect was a decrease in the mean velocity in the heat exchanger, a decrease in the expected pressure losses in the heat exchanger and duct work, and an increase in the effectiveness of the heat exchanger. Consequently, a system pressure ratio higher than the value corresponding to peak COP was chosen in order to achieve acceptable heat exchanger performance within the available physical space. The below optimum performance of turbomachinery and heat exchanger components, coupled with excessive bearing losses, meant that the predicted COP of the overall system dropped to around 0,41. The system pressure ratio at the design point was 2,14 and the corresponding mass flow rate of air was 0,278 kg/ moving the design point beyond the pressure ratio for peak COP, it was anticipated that the demonstrator plant would yield good part-load performance since the COP would not fall as the pressure ratio was reduced. Also, operating at part-load corresponded to lower flow velocities and anticipated improvements in heat exchanger performance. Part-load operation was achieved by reducing the speed of the primary compressor, resulting in a decrease in both pressure and mass flow rate throughout the . Prime mover and primary compressorThe existing diesel engine was judged adequate to power the demonstrator plant. The standard engine was a four cylinder, water cooled diesel engine fitted with a centrifugal clutch and all necessary ancillaries and was controlled by a microprocessor the thermodynamic model, the pressure ratio for the primary compressor was 1,70. The centrifugal compressor required a shaft speed of around 55 000 rev/min. Other alternatives were evaluated for primary compression with the aim of obtaining a suitable device that operated at a lower speed. Other commercially available devices such as Roots blowers and rotary piston blowers were all excluded on the basis of poor one-off gearbox was designed and manufactured as part of the project to step-up the engine shaft speed to around 55 000 rev/min. The gearbox was a two stage, three shaft unit which mounted directly on the end of the diesel engine and was driven through the existing centrifugal . Cold air unitThe secondary compressor and the expansion turbine were mounted on the same shaft in a free rotating unit. The combination of the secondary compressor and the turbine was designated as the ‘Cold Air Unit’ (CAU). While the CAU was mechanically equivalent to a turbocharger, a standard turbocharger would not satisfy the aerodynamic requirements efficiently since the pressure ratios and inlet densities for both the compressor and the turbine were significantly different from any turbocharger installation. Consequently, both the secondary compressor and the turbine stage were specially chosen and developed to deliver suitable turbochargers use plain oil fed journal bearings, which are low-cost, reliable and provide effective damping of shaft vibrations. However, plain bearings dissipate a substantial amount of shaft power through viscous losses in the oil films. A plain bearing arrangement for the CAU was expected to absorb 2–3 kW of mechanical power, which represented around 25% of the anticipated turbine power. Also, the clearances in plain bearings require larger blade tip clearances for both the compressor and the turbine with a consequential efficiency penalty. Given the pressurised inlet to the secondary compressor, the limited thrust capacity of the plain bearing arrangement was also a concern. A CAU utilising high-speed ball bearings, or air bearings, was identified as a preferable arrangement to plain bearings. Benefits would include greatly reduced bearing power losses, reduced turbomachinery tip clearance losses and increased thrust load capacity. However, adequate resources were not available to design a special one-off high speed ball bearing system. Consequently, a standard turbocharger plain bearing system was secondary compressor stage was a standard turbocharger compressor selected for a pressure ratio of 1,264. Secondary compressor and turbine selection were linked because of the requirement to balance power and match the speed. Since most commercial turbines are sized for high temperature (and consequently low density) air at inlet, a special turbine stage was developed for the application. Cost considerations precluded the manufacture of a custom turbine rotor, so a commercially available rotor was used. The standard turbine rotor blade profile was substantially modified and vaned nozzles for turbine inlet were designed to match the modified rotor, in line with previous turbine investigations at QUB (Spence and Artt,). An exhaust diffuser was also incorporated into the turbine stage in order to improve turbine efficiency and to moderate the exhaust noise levels through reduced air velocity. The exhaust diffuser exited into a specially designed exhaust performance of the turbine stage was measured before the unit was incorporated into the complete demonstrator plant. The peak efficiency of the turbine was established at 81%.5. Heat exchangersDue to packaging constraints, the heat exchangers had to be specially designed with careful consideration being given to heat exchanger position and header geometry in an attempt to achieve the best performance from the heat exchangers. Tube and fin aluminium heat exchangers, similar to those used in automotive intercooler applications, were chosen primarily because they could be produced on a ‘one-off’ basis at a reasonable cost. There were other heat exchanger technologies available that would have yielded better performance from the available volume, but high one-off production costs precluded their use in the demonstrator different tube and fin heat exchangers were tested and used to validate a computational model. Once validated, the model was used to assess a wide range of possible heat exchanger configurations that could fit within the Thermo King SL200 chassis. Fitting the proposed heat exchangers within the existing chassis and around the mechanical drive system for the circulation fans, but while still achieving the necessary heat exchanger performance was very challenging. It was clear that potential heat exchanger performance was being sacrificed through the choice of tube and fin construction and by the constraints of the layout of the existing SL200 chassis. The final selection comprised two separate aftercooler units, while the single recuperator was a large, triple pass unit. Based on laboratory tests and the heat exchanger model, the anticipated effectiveness of both the recuperator and aftercooler units was 80%.6. InstrumentationA range of conventional pressure and temperature instrumentation was installed on the air-cycle demonstrator plant. Air temperature and pressure was logged at inlet and outlet from each heat exchanger, compressor and the turbine. The speed of the primary compressor was determined from the speed measurement on the diesel engine control unit, while the cold air unit was equipped with a magnetic speed counter. No air flow measurement was included on the demonstrator plant. Instead, the air flow rate was deduced from the previously obtained turbine performance map using the measurements of turbine pressure ratio and rotational . System testingDuring some preliminary tests a heat load was applied and the functionality of the demonstrator plant was established. Having assessed that it was capable of delivering approximately the required performance, the plant was transported to a Thermo King calorimeter test facility specifically for measuring the performance of transport refrigeration units. The calorimeter was ideally suited for accurately measuring the refrigeration capacity of the air-cycle demonstrator plant. The calorimeter was operated according to standard ARI 1100-2001; the absolute accuracy was better than 200W and all auxiliary instrumentation was calibrated against appropriate performance capacity of transport refrigeration units is generally rated at two operating conditions; 0 and −20 °C, and both at an ambient temperature of +30 °C. Along with the specified operating conditions of 0 and −20 °C, a further part-load condition at −20 °C was assessed. Considering that the air-cycle plant was only intended to demonstrate a concept and that there were concerns about the reliability of the gearbox and the cold air unit thrust bearing, it was decided to operate the plant only as long as was necessary to obtain stabilised measurements at each operating point. The demonstrator plant operated satisfactorily, allowing sufficient measurements to be obtained at each of the three operating conditions. The recorded performance is summarised .In total, the unit operated for approximately 3 h during the course of the various tests. While the demonstrator plant operated adequately to allow measurements, some smoke from the oil system breather suggested that the thrust bearing of the CAU was heavily overloaded and would fail, as had been anticipated at the design stage. Testing was concluded in case the bearing failed completely causing the destruction of the entire CAU. There was no evidence of any gearbox deterioration during . Discussion of measured performanceFrom the calorimeter performance measurements, the primary objective of the project had been achieved. A unique air-cycle refrigeration system had been developed within the same physical envelope as the existing Thermo King SL200 refrigeration unit, w

唉,这位老兄要求还真不少啊.有这个空的话,自己去找了

你是学建筑环境也设备工程的不

  • 索引序列
  • 圆通相关论文研究
  • 关于圆柱与圆锥的研究小论文
  • 关于圆通物流论文答辩
  • 圆通物流现状及对策研究论文
  • 暖通空调相关研究论文英文
  • 返回顶部