• 回答数

    5

  • 浏览数

    271

童童564852078
首页 > 毕业论文 > 重力坝毕业论文目录

5个回答 默认排序
  • 默认排序
  • 按时间排序

~Miss.Q~

已采纳

Spring the river is containing the rich hydro-electric resources, valley section suits in the construction hydro-junction, the hydro-junction main goal is prevents floods the electricity generation. This article unifies opens the valley terrain geology characteristic, the hydrology characteristic, has carried on the preliminary design to its hydro-junction. The main content opens the valley hydro-junction including the spring river the basic document, the main building design, the key position scheme of arrangement, ground processing as well as the construction leads dams the current and so on the content. In had considered under each kind of factor, the choice second grade - second grade took this key project the dam spool thread, in the dam choice, carries on the good and bad points comparison after each kind of dam, unifies this project the local characteristic, chose the concrete entity gravity dam to take this hydro-junction the dam. Adjusts Hong to calculate uses the quite universal semigraphical method, after has compared three accents Hong plan had determined an appropriate plan, its design flood level is meters, the examination flood level meters, the definite top of dam elevation is meters. This key position main building by keeps off the water building, the drainage building, the electricity generation building, blows off the building to be composed. Passes the charging after to calculate (gravity dam is stable and stress computational procedure) and the stress and stably compares the nucleus, obtains the non- overfall dam the economical section plane, the top of dam width meters, the height meters; The drainage building uses the table hole overflow the way, the top of dam curve uses the practical WES curve, disappears can the way adopt selects class disappearing energy; The workshop dam section including three flow conditions and installment field sections, after the workshop uses the dam the type; Uses the deep hole achievement to blow off the building, the hole figure selects does not have presses in the dam the sluiceway. Finally constructs the conduction current to select two issues of two section of conduction current methods, an issue by ties the narrow river bed to release the class, two issues release the class by the conduction current bottom hole, opened the valley hydro-junction to the spring river to produce a quite complete design proposal.

177 评论

专业的吃货一枚

The spring river contains abundant water power resources, among them, ZHANG GU3 DUAN4 suiteds for to fix to set up the water conservancy vital point, the main purpose of the water conservancy vital point is a flood control to generate electricity. This text combines a valley form geology characteristics, the hydrology characteristic, as to it's the water conservancy vital point carried on the first step main contents includes the spring river ZHANG GU3 the basic data, main building design, vital point of the water conservancy vital point arranges the project, the foundation processing and constructions to lead to cut to flow etc. contents. Considered various factor under, the choice B - B conduct and actions originally the dam stalk line of the vital point engineering, choice in the dam type, to various dam type after carrying on the merit and shortcoming comparison, combine the local characteristics of this engineering, choose the concrete entity gravity dam conduct and actions originally the dam type of the water conservancy vital the 洪 calculation adoption more widespread half illustrated manual table method, at compare three adjust the project of 洪 after made sure a fit project, get it designs the flood as meters, the flood a meters of the school pit, make sure that a high distance of dam is building of this vital point from block the building of water, leak water the building, generate electricity the building and put the empty building to machine-readable( the gravity dam stability and should dint calculation procedure) and should to compare with pit, the dint and stabilities are after, getting to overflow the economic section of flow the dam not, meters of a breadth of dam, high meters;Leak water the building adoption watch bore overflows the way for flow, a curve of dam adopts the practical curve of WES, eliminating the ability method to adopt to pick to flow to eliminate the ability;The factory premises dam segment includes a segment of three machines and an installs a segment, the factory premises adoption dam is behind type;Adoption deep bore conduct and actions put the empty building, the bore figure choose and use and did not press the dam inside end construction leads to flow to choose to use two expect the two pieces to lead to flow the method, on expect from tie the narrow river bed to leak to flow, two expect from lead to flow the bottom bore to leak to flow, to the spring river ZHANG GU3 the water conservancy vital point give a the design project that compares the integrity.

279 评论

隔壁老袁无敌

Spring river 蕴藏 abundant water power resources, among them piece the main purpose for valley segment suitable forly fixing set upping the water conservancy vital point, water conservancy vital point is a flood control to generate electricity. This text combination piece valley geography geology characteristics, hydrology characteristic, as to it's the water conservancy vital point proceeds first step design, vital point of basic data, main building that main contents include the vital point of a valley water conservancy arranges the project, foundation to handle and start construction the 导s to cut the 流 etc. the contents. Under the consideration the every kind of factor, choice B - B conduct and actions this vital point the engineering's 坝 stalk line, on the choice of the 坝 type, the right every kind of 坝 type proceeds 优 weakness the comparison is after, and join together this engineering of when ground characteristics, chose the concrete entity gravity the 坝 to be used as this water conservancy the vital point's 坝 调洪 calculates the adoption the method of widespread half illustrated manual table, at the project that compare three 调洪s the project after make sured a fit, get its design flood is rices, 校核 flood rice, certain 坝 crest high 程 is main building of this vital point be leak watered by 挡 water building, building, generate electricity the building, put the 空 building to machine-readable( gravity 坝 stability with should dint calculation procedure) with should dint and stability than the 核 is after, and have to out not 溢流 the 坝 's breadth of economic section, 坝 crest rice, high rice;Leak water practical WES curve, 消 of curve adoption of the 流 's way, 坝 crest of watch bore 溢 of building adoption can the way adopt the 挑流消 can;Factory premises 坝 the segment include the segment of three machine sets with the segment of a gearing field, factory premises adoption after the 坝 type;The deep bore conduct and actions of adoption puts the 空 building, bore figure to choose to use to have no to press the 坝 inside to start construction the 导流 choose to use the 导流 of two two pieceses the method, be designed spring river piece valley water conservancy vital point gave out aly completely by tie the narrow river bed 泄 the 流 , second periods are from the 导流 bottom bore 泄流 , project.有不能翻译的自己找找资料吧!

239 评论

偶素小cici

哥们,这个成果还在没,急求啊!要什么换都没问题

279 评论

TTTTTTTT醬

请参考下面2篇:【题名】:水利工程【摘要】: 水利工程基础学科混流式水轮机转轮动载荷作用下的应力特性;受漩涡作用的水下块石的起动流速;复式河槽流量计算方法比较与分析;二维溃坝洪水波的演进绕流和反射的数值模拟;分部面积超蓄产流法;天然河流被改变条件下的降雨径流预报模型;面向对象方法在河网非恒定流计算中的应用;水工材料土工合成材料加筋土抗剪作用的试验研究;新老混凝土粘结面渗透性能试验研究;水工结构土石坝沉降一填筑灰色监测模型分析;高碾压混凝土拱坝分缝形式及破坏机理研究;碾压混凝土拱坝单向间隔诱导缝等效强度研究。【题名】:水利工程【摘要】:水利工程基础学科 突扩突缩式内流消能工的数值模拟研究;湖底地形对风生流场影响的数值研究;动水环境中有限宽窄缝湍射流的水力特性研究;双局部行进波对流的时空结构;水工材料 钢筋混凝土结构锈蚀损伤的解析解;跳回失稳研究;浇筑式沥青混凝土防渗层配合比优选方法研究;堤基渗流管涌发展的理论分析。

200 评论

相关问答

  • 重力坝毕业论文实例

    先选定题目啦可以多和导师交流然后自己查看相关论文寻找思路实在不会找我采纳哦!

    最爱黄冕 6人参与回答 2023-12-09
  • 毕业论文翻重力坝

    要看你选择的方向。

    helloJ80430 5人参与回答 2023-12-06
  • 会计毕业论文盈利能力目录

    企业盈利能力分析和新旧会计准则的比较分析关于这两个题目企业盈利能力分析需要一些数据和表格的支撑新旧会计准则的比较分析偏理论化一点个人建议你可以选择新旧会计准则的

    叶丽美11 2人参与回答 2023-12-05
  • 重力坝毕业论文答辩

    重力坝,拱坝,支墩坝,土石坝,这四大坝型,其中支墩坝不常见。

    大鹏村长 3人参与回答 2023-12-10
  • 重力坝毕业论文前言

    根据学术堂的了解,前言也叫引言,是正文前面的一段短文。前言是论文的开场白,目的在于向读者说明本研究的来龙去脉,吸引读者对本篇论文产生兴趣,对正文起到提纲掣领和引

    机器猫TJ 8人参与回答 2023-12-05