• 回答数

    4

  • 浏览数

    92

大酸杏儿
首页 > 期刊论文 > 溢流坝设计毕业论文

4个回答 默认排序
  • 默认排序
  • 按时间排序

一心跟着习大大

已采纳

拦河坝设计?以下中达咨询带来关于拦河坝设计的相关内容,供以参考。坝型为自由溢流重力坝,采用M7.5浆砌块石,迎水面设0.2mC15砼结构。设计坝高为1.5m,溢流堰长度分别为4m、3.5m、4.5m、5m和4.5m,坝顶宽度为1.00m,坝基础底宽为3m,高0.50m,坝身上游面为垂直,下游面坡比为1:1。护岸采用M7.5浆砌块石,墙高高出坝顶1m,基础为扩大基础,顶宽0.5m,内侧坡比为1:0.30,外侧为1:0.15。1水文水利计算拦河坝控制流域面积经从1:1万地形图量算。洪峰流量采用地区经验公式计算设计洪峰流量,小流域汇流计算采用经验公式,其解释表达式:Q=C.FnCv=1.17/F0.11Cs=3.5CvQp.=(Φp.Cv+1)Q式中:Q――年最大洪峰流量的多年平均值(m3/s)Qp―――设计洪峰流量(m3/s)C---综合系数取值4.2n――指数取值0.75则:Q=4.2F0.75F----流域面积(km2)Cv――变差系数Cs――偏态系数Φp――皮尔逊Ш型曲线的离均系数坝基工程地质条件一、基本地质条件坝址地形较陡,两岸山坡坡度约30-40о,出露岩性为朱罗系(J3C)地层,岩性以砂岩、凝灰岩为主;岩浆岩(γ52(3)C),岩性以花岗岩、黑云母花岗岩为主,岩体呈弱风化状,强度较高。河床为冲洪积砂砾卵石、漂石覆盖。地质构造较简单,仅发育几组节理裂隙,未发现不利于岩体稳定的结构面或结构体。据《中国地震动参数区划图》(GB18306-2001)及福建省建设厅文件《闽建设(2003)10号》,清流县地震设防烈度为6度。二、坝基开挖原则1、河床部位,冲洪积不宜作为坝基,应予以清除。开挖深度0.5-1.0m。2、岸坡坝基应清除表部松动岩体、崩积物及残坡积土,开挖深度1.0-2.5m。3、建议边坡开挖坡度:坡残积土厚度小,易清除,强风化带岩体1:0.75,弱风化带岩体1:0.3~0.5。三、坝基稳定分析由于弱风化基岩埋深较深,坝基可座落于强-弱风化基岩上,岩体内无不良构造线穿过,不存在坝基深层滑动的边界条件,坝基稳定性好。据工程类比,该弱风化岩体天然容重为27.0KN/m3,抗剪断强度中,内摩擦角为24.5o,粘聚力为6.5Mpa,岩石饱和极限抗压强度为50.0Mpa,完全满足拦河坝对地基承载力的要求。四、坝基渗漏根据坝基岩体节理裂隙发育程度及结构类型,坝基及坝肩岩体强-弱风化岩层,以弱透水~微透水或微~极微透水为主,透水率为q=5~0.5(Lu)或q=0.5~0.05(Lu);在坝肩为强-弱风化的局部地段存在渗漏及渗透问题,应予以处理。五、边坡稳定问题边坡以强-弱风化岩质边坡为主,且开挖高度有限,边坡稳定。拦河坝设计拦河坝设计3大坝设计计算(1)坝型选择引水坝是在冲毁坝址上重建,结合实地察看和地形地质情况,拦河坝采用溢流重力坝。(2)洪水成因及特性:本流域洪水由暴雨形成,形成本流域暴雨的主要大气系统是切变、涡切变,低槽和低涡等。三、四月由于小槽涡频频活动于西风带而出现小暴雨,五、六月间受地面低压锋系和盛行的西南气流影响,冷暖气团在本流域上空交绥对峙,极锋在北地带活动频繁,常产生大范围、持续性的暴雨天气。历年最大洪水及历史特大洪水多系锋面所致,台风对本流域影响不显著。(3)设计基本资料①设计依据:本设计依据的法律法规、规范标准和参照的有关资料如下:《浆砌石坝设计规范》(SL25-91)、《水利水电工程等级划分及设计标准》(SL252-2000)、《水工混凝土结构设计规划》(SL/T191-96)②水文气象:多年平均气温18.2℃,日最高温度38.8°C,最低温度-8.9°C,常年平均降雨量1801.3mm,多年平均径流深959mm,年平均风速1.5m/s,瞬时最大风速20m/s。③防洪标准:10%,相应洪峰流量:见拦河坝10年一遇洪水设计流量计算见表5-1。④材料容重:混凝土24KN/m3、浆砌块石21KN/m3、回填砂石19KN/m3、回填土16KN/m3、天然砂砾石覆盖层19KN/m3。拦河坝设计拦河坝设计⑤地震烈度:地震设防烈度为6度。⑥地基特性及设计参数:工程所处位置地层相对较厚,约1.5-2.5米。力学参数取值如下:堆积层允许承截力fk=20~25kg/cm2,基础抗剪摩擦系数f=0.45。(4)坝断面设计本工程坝型均为溢流重力坝,采用M7.5浆砌块石。设计坝顶宽度为1.0米,上游面垂直,下游面坡比为1:1.00。坝后设防冲消能设施。(详见拦河坝工程特性表、设计断面图)表5-2拦河坝工程特性表(5)坝抗滑稳定及应力计算A.荷载组合本工程为小型引水工程。在抗滑稳定及应力计算中,溢流坝抗滑稳定及基础应力的计算长度取单位坝段。作用在溢流坝的荷载有:坝自重、水压力、扬压力、泥沙压力、动力压力及浪压力,根据规范要求荷载组合分基本组合和特殊组合分别进行计算,组合如下:①基本组合:设计洪水位水压力+下游水压力+扬压力+自重+泥沙压力+浪压力②特殊荷载组合:校核洪水位水压力+下游水压力+扬压力+自重+泥沙压力+动水压力+浪压力B.坝体抗滑稳定及应力分析拦河坝设计拦河坝设计坝体的抗滑稳定按抗剪断公式进行计算,计算公式如下:f′∑W+c′AKs=--------------≥[K]∑P式中:Ks---抗滑稳定安全系数;f′---砌体与地基抗剪断摩擦系数,取0.90;c′---抗剪断凝聚力,取0.70Mpa。∑W---作用在计算截面以上坝体的全部竖向荷载;t∑P---作用在计算截面以上坝体的全部水平向荷载;t[K]---抗滑稳定允许安全系数,基本组合3,特殊组合2.5。坝基面的坝体应力应满足①小于坝基础的容许压应力;②一般不出现拉应力。经计算,溢流坝的抗滑稳定安全系数及应力成果详见下表5-3:(6)拦河坝翼墙、下游护岸设计①翼墙高程确定本工程拦河坝洪水标准采用十年一遇设计,二十年一遇校核。根据实测河道断面,经计算堰上过为1.00m时,泄流量小于设计洪峰流量。具体如下表5-4。泄流量计算采用下式:Q=m×ε×σm2gHB式中:Q—泄流量,m3/s;m—流量系数;σm—淹没系数;ε—侧收缩系数;B—溢流前缘净宽,m;H—堰上水头。表5-4堰顶过水深计算成果表②护岸断面尺寸护岸采用M7.5浆砌块石,墙高等于坝高,基础为扩大基础,清基0.80米,顶宽0.60米,内侧破比为1:0.30,外侧为1:0.00。更多关于标书代写制作,提升中标率,点击底部客服免费咨询。

215 评论

送我个时光机

Spring the river is containing the rich hydro-electric resources, valley section suits in the construction hydro-junction, the hydro-junction main goal is prevents floods the electricity generation. This article unifies opens the valley terrain geology characteristic, the hydrology characteristic, has carried on the preliminary design to its hydro-junction. The main content opens the valley hydro-junction including the spring river the basic document, the main building design, the key position scheme of arrangement, ground processing as well as the construction leads dams the current and so on the content. In had considered under each kind of factor, the choice second grade - second grade took this key project the dam spool thread, in the dam choice, carries on the good and bad points comparison after each kind of dam, unifies this project the local characteristic, chose the concrete entity gravity dam to take this hydro-junction the dam. Adjusts Hong to calculate uses the quite universal semigraphical method, after has compared three accents Hong plan had determined an appropriate plan, its design flood level is 306.3 meters, the examination flood level 307.1 meters, the definite top of dam elevation is 310.9 meters. This key position main building by keeps off the water building, the drainage building, the electricity generation building, blows off the building to be composed. Passes the charging after to calculate (gravity dam is stable and stress computational procedure) and the stress and stably compares the nucleus, obtains the non- overfall dam the economical section plane, the top of dam width 12.5 meters, the height 125.9 meters; The drainage building uses the table hole overflow the way, the top of dam curve uses the practical WES curve, disappears can the way adopt selects class disappearing energy; The workshop dam section including three flow conditions and installment field sections, after the workshop uses the dam the type; Uses the deep hole achievement to blow off the building, the hole figure selects does not have presses in the dam the sluiceway. Finally constructs the conduction current to select two issues of two section of conduction current methods, an issue by ties the narrow river bed to release the class, two issues release the class by the conduction current bottom hole, opened the valley hydro-junction to the spring river to produce a quite complete design proposal.

270 评论

易超风格

拦沙是溢流坝的主要功能,主要是用来控制河流中的沙砾,减少河流的淤积,以及河道的淤塞,防止河道的扩展。拦沙坝的设计一般是以淤积防护为主,即拦沙坝的主要功能是控制河流中的沙砾,减少河流的淤积,以及河道的淤塞,防止河道的扩展。

275 评论

贪吃的懒妞

建造溢流坝的原因:作为泄洪建筑物的坝内式厂房溢流坝、厂房顶溢流和挑越厂房顶泄流的厂坝联合泄洪方式,可用在高山狭谷地区,是宣泄大流量时,解决溢洪道和电站厂房布置位置不足的一种途径,也是从溢流坝发展起来的新形式。

设计要求:

①有足够的溢流前沿长度和泄流能力以满足防洪要求;

②水流平顺,坝面无不利的负压或振动;

③下泄水流不造成危害性冲刷。高水头溢流坝泄水流速可达30~40m/s或更大,下游河床单宽消能功率可达几万甚至几十万千瓦。

从溢流或泄水段到下游消能工设计要解决好:空蚀和磨蚀、掺气和雾化、轻型结构的振动、河床和岸坡的冲刷等一系列高速水流问题。

要选择合适的坝顶和堰面曲线形式:既要有较大泄流能力,又要有稳定的水流形态和免遭空蚀破坏、容易施工的体型。较好的消能工形式和尺寸对枢纽各建筑物的安全运行具有重要意义。近期的高坝建设中,在新型消能工技术、通气减蚀措施等许多方面都获得了较大的进展。

178 评论

相关问答

  • 物流方案设计毕业论文

    电子商务已经深刻改变着人们的生活与生产方式,而城市物流配送效率的高低则是电子商务顺利完成的关键因素。下面是我为大家整理的物流配送 毕业 论文,供大家参考。

    满天星RF 2人参与回答 2023-12-11
  • 出口流程设计毕业论文

    1. 中国-东盟自由贸易区的效应、障碍及前景分析 2. WTO争端解决机制的缺陷及其完善分析 3. 我国国际货运代理业存在的问题与对策分析 4. 中小企业

    Nightwish阳光 4人参与回答 2023-12-06
  • 物流毕业论文方案设计

    4、 仓储物流人员主要职责仓储物流人员主要职责类别:仓储管理 大小:80 KB 日期:2008-02-165、 2007年仓储物流部年度工作总结2007年

    哇小妹夫 2人参与回答 2023-12-11
  • 水电站土石坝设计论文模板

    浅谈土石坝防渗变形的处理措施论文 土石坝在我国水利工程施工中由来已久,它的主要材料是由本地的土料、石材以及土石混合材料构成,经过有序的碾压、回填等方式筑成的挡水

    jhaiyun888 3人参与回答 2023-12-10
  • 水库大坝除险加固设计毕业论文

    中小型病险水库的除险加固设计是保障工程发挥潜在综合效益的必要技术措施。本文以运城市涑水河流域沙渠河支流上的小(1)型三河口水库为例,分析了工程建设的内容,总结了

    么么哒狂人 2人参与回答 2023-12-08